Sutherland

Before
After

Project Name: Roofing Application (Under)

Location: Davao City

Company: Sutherland

Applicator: S.E.A Olympus Marketing Inc.

System: ECOFOAM Spray-up Application

Total Area: 673.37 sq. meters

Date Completed: July 2008

PROBLEM

  • As an exiting building formerly known as The Venue, such was renovated to accommodate the operations of Sutherland Call Center wherein a 24-hour operation is expeected to take place. Such would entail the maintenance of comfort of call center agents as well as other tenants of the building. The project requires the replacement of dilapidated stapled insulation sheets and replace it with a superior insulation material that would have a strong adhesive properties, add to the water proofing systems and control the air conditioning system in order to save on electricity costs.

SOLUTION

  • Ecofoam Polyurethan Foam Insulation was sprayed under the existing roofing system in order to add its structural strength, promote its water proofing capabilities and reduce electrical costs during the expected 24-hour operation of the building. At present, the building occupants have no complains about the HVAC system inside the building and at the same time the owner’s are experiencing controlled electrical cost compared when they were using the dilapidated stabled insulation system.