Primary Structure Corp.

Before
After

Project Name: Roofing Application Project

Location: V. Rama St., Cebu City

Company: Primary Structure Corp.

Applicator: S.E.A Olympus Marketing Inc.

System: ECOFOAM Spray-up Application

Total Area: 3935.91 sq. meters

Date Completed: December 2008

PROBLEM

  • The existing structure had a lot of leaks due to the dilapitated roofing and the working environment is too hot for their storage and work area. They want these problem to be resolved.

SOLUTION

  • Upon knowing of ECOFOAM, they are convinced to use it and apply in the roof top as a solution to their leaking problem. Before installing ECOFOAM, the area was cleaned first and they apply epoxy primer to free it from rust, dust and oily substrate. In the following day, installation of ECOFOAM was then started. Because ECOFOAM is quick and non-disruptive, installation was done after a week or two and there are no distractions in their operation. As a result it has lowered the thermal conductivity and various heat transfer thus, improving the hot working area. Water leaking was then eliminated because ECOFOAM creates a seamless result sealing all gaps, holes and crevices. Everyone now is working in a cooler environment with no more leaking during rainy seasons.